Inspect
Review the floor, access, required depth, finish and programme.
BOBF uses purpose-built equipment to batch, mix and pump smoothing compounds, rapid-drying screeds and foam concrete for efficient commercial floor build-up.
The self-contained system helps simplify site logistics, reduce manual handling and maintain consistent material delivery across large areas and multi-storey projects.
A self-contained mobile batching, mixing and pumping system for smoothing compounds, rapid-drying screeds and foam concrete.
Every project starts with an assessment of the real floor, access and programme.
Review the floor, access, required depth, finish and programme.
Select the right equipment, materials and preparation method.
Complete the agreed removal, grinding, pumping, screeding or flooring works.
Leave the floor in the agreed condition, ready for its next stage.
Explore BOBF floor removal, preparation, pumping, flooring, fit-out and site-work photography from projects across Ireland.
A large commercial floor left smooth and ready for the next project stage.
A finished food counter and surrounding commercial interior.
A durable floor finish through a commercial corridor and adjoining rooms.
A finished resilient floor in a bright, high-use interior.
Send the site location, approximate area, existing floor, photographs and programme. BOBF will advise the next step.